Blog/New construction
Schedule the 11th-month warranty inspection before coverage ends
September 24, 2026 · 3 min read · Golden Scope Inspections

The first year is your documentation window
Most builder warranties include a workmanship period that ends around the first anniversary. After that date, drywall cracks, nail pops, door adjustments, and some leaks become your cost unless another warranty still applies.
An 11th-month inspection gives you a written list while the builder is still obligated to review those items. Waiting until month thirteen usually means a polite no.
What we look for in a new house
We operate doors and windows, check visible roof and flashing conditions, run plumbing fixtures, and look at the electrical panel, HVAC operation, and drainage away from the slab.
Cosmetic paint touch-ups matter less than items that let water in, affect safety, or show the house was not finished to the plans. Photos in the report make the builder request easier to submit.
Send one clear request
Submit the inspection report with a short list of requested repairs. Keep copies of emails. If the builder disputes an item, you still have a dated record of the condition before the warranty expired.
Phase inspections during construction catch more than a final walkthrough. If you are still building, a pre-pour, rough-in, and final inspection is the stronger path. The 11th-month visit is the safety net after you have already moved in.
Next step
Ready for a closer look?
Book a 11th-month warranty inspection or call (832) 833-2863. Reports are delivered within 24 hours.
More from the blog
- How to prepare a Houston home for inspection day
October 8, 2026
- Why Houston sellers inspect before they list
October 2, 2026
